Monday, 24 June 2013

Brief evaluation of final video



This is a link to our final edit of our remake of Ed Sheeran's The A Team. 
I think that the timings of the edits were well done and the mise-en-scene, such as the location and props were quite close to the original.
I think that some of the camera movements could be improved.

Thursday, 13 June 2013

Filming schedule


Friday 14th June 9-10.10am

Monday 17th June (if needed) 2.50-4pm

Timings

the timings of the video
0.25 – edit one
0.27 – edit two
0.31 – edit three
0.33 – edit four
0.35 – edit five
0.38 – edit six
0.42 – edit seven
0.45 – edit eight
0.47 – edit nine
0.51 – edit ten

Friday, 7 June 2013

Ed Sheeran- The A Team

This is the music video that we are going to try and reconstruct about 60 seconds of.

Brief

To shoot a 60 second reconstruction of an existing music video.